01/06/2022
pdf
70.6 kB
First Market Coupling Consultative Group meeting, where NEMOs, TSOs and participants will discuss and share views on the ongoing work related to the design, development, implementation, and operation of SDAC and SIDC. A Q&A session is planned after each topic
20/05/2022
pdf
140.6 kB
Updates to the ETS 3.5.3 Production and Simulation environments*; • Connection Settings Updates for ETS Client Users • ETS API Upcoming Versions – Old TLS Decommission • Cipher Suites Decommission
05/05/2022
pdf
154.4 kB
Important information – Action required • M7 6.12 release to go-live on 10 May 2022 • Release includes implementation of Load Management (Technical Phase) • Reminder: Member testing available since 22 March 2022 until go-live • New Com Trader 6.12 version mandatory as of go-live • Final decommissioning of the old M7 prod URLs • API: list of known M7 6.12 API issues and fixes (link here)