10 of 518 Documents
  1. MCCG draft agenda 7th June 2022

    01/06/2022

    Portable Document Format (PDF) pdf 70.6 kB

    First Market Coupling Consultative Group meeting, where NEMOs, TSOs and participants will discuss and share views on the ongoing work related to the design, development, implementation, and operation of SDAC and SIDC. A Q&A session is planned after each topic

     Download
  2. SEMOpx ETS 3.5.3 Production and Simulation Updates

    20/05/2022

    Portable Document Format (PDF) pdf 140.6 kB

    Updates to the ETS 3.5.3 Production and Simulation environments*; • Connection Settings Updates for ETS Client Users • ETS API Upcoming Versions – Old TLS Decommission • Cipher Suites Decommission

     Download
  3. April 2022 Monthly Report

    09/05/2022

    Portable Document Format (PDF) pdf 287.8 kB

     Download
  4. M7 6.12 Release Go Live Information

    05/05/2022

    Portable Document Format (PDF) pdf 154.4 kB

    Important information – Action required • M7 6.12 release to go-live on 10 May 2022 • Release includes implementation of Load Management (Technical Phase) • Reminder: Member testing available since 22 March 2022 until go-live • New Com Trader 6.12 version mandatory as of go-live • Final decommissioning of the old M7 prod URLs • API: list of known M7 6.12 API issues and fixes (link here)

     Download